Debris Hauling Trips Calculator

Hauling it yourself looks free because the truck is already in the driveway. It stops looking free at the fourth round trip, when you have spent a Saturday driving and the gate has charged you a minimum four times. This works out how many trips the material is, how long they take, and what each route costs at your own numbers.

From a take-off or from a measured pile. Loose, as it will be loaded, not as it sits in the wall.
The other half of the problem. A tear-off or anything with mortar in it will be far heavier per yard than framing and cabinets.
Between the wheel wells if that is what limits you
How high you will actually load, not how tall the sides are
Zero for anything that has to be tarped flat. Loose bulky debris can be heaped; sharp demolition debris usually should not be.
Off your own door placard, owner manual or trailer plate, less anything already in the vehicle. This page reports against it and does not judge it.
Door to door including the queue at the gate, which is why it is lower than you would like
Optional
Both ends. Hand loading a bed of demolition debris and then hand unloading it is most of the day.
Optional. A flat charge per load, if the facility has one.
Optional. Your own quoted rate.
Many facilities bill a minimum whether the load reaches it or not, which is what makes small loads expensive
Optional, and the field that changes the answer most
Optional. Delivered price per container including the pull.
Optional
Debris Hauling Calculator — Trips, Hours and Real CostBuildFigure

Two limits again, but this time they are yours

A container has a size and a weight allowance. A pickup has a bed and a payload rating, and the same arithmetic applies with worse numbers. An eight foot bed sixty inches wide loaded twenty inches deep is 66.7 cubic feet, which is 2.47 cubic yards. A payload figure of 1,500 pounds is 0.75 tons. Whichever of those two runs out first sets the trip count, and for demolition debris it is almost always the payload.

Work it through on the default job. Eight loose cubic yards at 2.4 tons is 0.3 tons per cubic yard, which is light mixed debris. By volume that is four trips, each one 81 percent of the bed. By payload it is 4,800 pounds divided by 1,500, which is four trips as well. Make the same eight yards weigh six tons instead — add tile, plaster or a mortar bed — and the volume answer does not move while the payload answer becomes eight trips at 1,500 pounds each. The bed is 41 percent full on every one of them.

The minimum charge is what makes small loads expensive

Many disposal facilities bill a minimum tonnage per visit whether the load reaches it or not. If the minimum is a quarter ton and you arrive eight times with a fifth of a ton, you have paid for two tons and delivered one and a half. That is the mechanism that makes multiple small loads cost more than one container even before fuel, and it is why the calculator reports what you paid for and did not deliver as a separate line.

Where the hours go

Per tripDefaultEight trips
Loading and unloading, both ends45 min6.0 hr
18 mile round trip at 28 mph39 min5.1 hr
Total1.4 hr11.1 hr

Loading by hand is the larger half and it is the half people leave out, because the drive is the part that feels like the errand. Forty-five minutes a trip for hand loading demolition debris into a bed and then hand unloading it at the other end is not pessimistic. It is also unpaid, repeated, and done at the end of a day of demolition, which is when injuries happen.

What the comparison leaves out on purpose

The container figure here does not include the labour of carrying debris out to the container, because that labour exists in both routes and cancels. What it does not cancel is the walk: a container sitting in the driveway is a short carry, and a truck that has to be parked on the street is a long one. It also excludes the rental days, which matter if the demolition runs over a week, and any permit that a container standing on a public street might require where you are.

The honest summary is that hauling it yourself wins on small jobs and loses on anything over a few yards, and that the crossover arrives earlier than people expect once the time line is filled in. Leave the hourly value blank and the comparison flatters the truck, which is exactly how most people make this decision. For the take-off that produces the two numbers at the top of this page, the remodel debris calculator covers interior tear-out, the roof tear-off calculator covers roofing, and the concrete slab removal calculator covers flatwork. If the debris is already in a heap and you are trying to size it, the debris pile volume calculator measures it. What an hour of your own time is worth, if you have never put a number on it, is what the hourly value calculator is for.

Questions people ask

How many pickup loads is a dumpster?

A full size eight foot bed loaded level to twenty inches holds about 2.47 cubic yards, so a twenty yard container is around eight bed loads on volume alone. Weight usually intervenes first: if the debris runs a ton per cubic yard, a half ton payload rating is reached at half a yard and the same twenty yards becomes forty trips. Which number applies depends entirely on what the debris is, which is why the calculator asks for both volume and weight.

Is it cheaper to rent a dumpster or haul it myself?

Below about two or three yards, hauling usually wins. Above that the trip count, the repeated gate minimum and the fuel start to add up, and if you put any value at all on the hours the container tends to win well before ten yards. The calculator does the comparison at your own rates and shows it both with and without your time counted, because those two answers are often on opposite sides.

How much does a cubic yard of demolition debris weigh?

It depends completely on what it is, and the range is enormous. Light mixed debris of framing, cabinets and packaging can be under 300 pounds a cubic yard. Drywall, roofing or anything with mortar in it runs several times that, and broken concrete is around 2,600 pounds a cubic yard. Enter your own weight if you have a scale ticket; if you do not, the pile volume calculator produces a range rather than pretending to a single figure.

Can I overload my truck if the debris still fits in the bed?

Volume and weight are separate limits and demolition debris reaches the weight one first. What a vehicle is rated to carry is on the door placard and in the owner manual, and what it may legally carry on a road is a matter for your state. This page reports the weight per trip beside the figure you entered and takes no view on either. If the two numbers are close, the place to settle it is a scale, not a calculator.

Why does the calculator ask for average speed instead of just the distance?

Because the drive is not the whole trip. Queueing at the gate, weighing in, being directed to a tipping face, unloading by hand and weighing out are all part of the round trip and they do not scale with distance. Twenty-eight miles an hour door to door on an eighteen mile round trip is not a comment on traffic, it is what the facility adds. Adjust it after your first load, when you know.